![](https://stolk.ca/wp-content/uploads/2021/07/DSC00518-1024x685.jpg)
Coca Cola CHP installation
The scope of work included the installation of a 800Kw CHP system and 2 new 500bhp boilers at the Coca Cola bottling facility at 24 Fenmar Drive, North York.
Read More
![](https://stolk.ca/wp-content/uploads/2021/03/Apr-29-pic-1-1024x768.jpg)
Timmins Area District Hospital
Installation of a 1.57MW Hybrid CHP and GA system for the Timmins and Area District Hospital
Read More