Ingredion
PROJECT DESCRIPTION
This project involved extending the truck and rail material loading section of the existing building; cutting existing concrete and asphalt, excavating, installing grade beams and piers, erecting custom fabricated structural steel, steel roof trusses, metal wall cladding and metal roof deck, installing new concrete floors and asphalt approaches; and relocating existing overhead doors.
Key Elements of this project included:
- Subcontractor coordination
- Installation of beams
- Erection of structural steel
- Concrete floors